Sunday, September 25, 2005

Last Week of Industrial Training

Wow. 4 weeks have passed. Time really flies. Most of the time during my stay at Renesas, I did not do much It work. The only IT work that I can think of is this website.



It took me about 2-3 weeks to design and get it up. However, after some time, it still needed tweaks here and there. I guess that the final product is much better than the initial.